Merseyside Cycling Campaign (MCC) welcomes the publication of the Draft Local Transport Delivery Plan and the opportunity to comment.
We strongly support the Local Transport Plan’s recognition that walking, wheeling and cycling are core transport modes essential to an integrated, accessible and low-carbon transport system. It is encouraging to see active travel embedded in the LTP’s vision and principles, and prominently represented in the document.
However, a Delivery Plan must go beyond aspiration. It must demonstrate how ambitions will be funded, prioritised and delivered. Without greater clarity and commitment, there is a risk that active travel remains a stated objective rather than a realised outcome.
1. The Delivery Plan must clearly identify funding, phasing and certainty
A delivery plan must distinguish between:
- Confirmed and allocated funding
- Realistically anticipated funding
- Aspirational or unfunded schemesFor each major project or programme, the Plan should set out:
- Identified budgets
- Funding sources
- Delivery timelines
- Lead delivery bodies
- Measurable outcomes
Without this transparency, the Plan risks becoming a catalogue of intentions rather than a credible implementation strategy.
We note, for example, that large individual schemes appear costed at levels far above what neighbourhood-wide networks could deliver if designed strategically and delivered at pace.
A clear financial framework would allow meaningful scrutiny of whether resources are being allocated effectively across the City Region.
2. Active travel must be embedded in all transport investment
Active travel must not be treated as a standalone programme delivered only when specific funding is allocated. It should be a core design requirement of all transport schemes.
This means:
- Applying Active Travel England (ATE) standards to highway and junction schemes as well as to dedicated active travel projects
- Delivering physically protected cycling infrastructure wherever traffic volumes and speeds require it
- Designing safe, legible and inclusive junctions suitable for people of all ages and abilities
- Signalled crossings should always be provided where possible, with quick response signal phases prioritising cycling and walking
- Ensuring schemes form part of a connected city-region network, not isolated route fragments
Whenever highway funding is spent, active travel infrastructure should be upgraded as a matter of course. Major junction redesigns must not undermine cycling or walking safety and convenience.
3. 20mph and safer street design must be central
The Plan does not give sufficient emphasis to 20mph limits and safer street design. We strongly support:
- 20mph as the default speed limit on residential and high street roads
- A street design approach focused on safety, health and liveability rather than traditional highway engineering
Evidence shows that lower speeds reduce casualties, improve perceptions of safety and improve air quality. If the LTP is serious about its Vision Zero and health objectives, 20mph must be treated as a foundational intervention rather than a marginal one.
4. Dangerous junctions must be prioritised
The Delivery Plan does not sufficiently address the redesign of dangerous junctions.
Improving junction design is one of the most effective measures for improving safety and encouraging everyday cycling and walking, together with priority for active travel users in the signal phases. A clear programme to identify, prioritise and redesign the most dangerous junctions across the City Region should be included.
5. Active travel ambition and targets require clarification
The Plan references an 8–35% increase in walking and cycling trips. This requires clarification. For example:
• Cycling currently represents around 2% of journeys under 5km. An 8% increase (for both cycling and walking) applied to a 2% baseline could produce only a marginal change in real terms to the number of journeys taken by bike.
Targets must be:
- Clear
- Mode-specific
- Transparent about baseline figures
- Sufficiently ambitious to align with climate and health objectives
Similarly, the metric stating that 11% more residents will live near the cycle network is insufficient unless accessibility, connectivity and quality are also addressed. Proximity alone does not guarantee usability.
6. Land-use planning must align with transport objectives
Transport outcomes are inseparable from land-use planning. The Delivery Plan should explicitly cascade LTP objectives into:
- Local Plans
- The emerging Spatial Development Strategy (SDS)
- Development management decisionsThis includes:
- Promoting densification and brownfield reuse
- Avoiding car-dependent sprawl
- Embedding active travel infrastructure at the start of development projects
Major sites such as the former Royal Hospital site, the Garden Festival site, and potential Liverpool North development provide opportunities to demonstrate best practice. Active travel and public transport integration must not be afterthoughts
7. Bus priority must be significantly strengthened
Bus lanes and priority measures are essential to achieving modal shift and reducing congestion.
If the City Region is not delivering a tram network within this period, it must deliver a comprehensive and coherent bus lane network by 2032. Liverpool in particular has the road space to do so.
Bus priority should be treated as core infrastructure, not incremental improvement.
The Queensway Tunnel should be reconsidered within the Urban Mobility and Public Spaces Strategy framework. By 2032, serious consideration should be given to restricting its use to buses, taxis and essential vehicles, reducing private car through-traffic in the city centre.
8. Urban Mobility and city centre car reduction
The Delivery Plan does not sufficiently reflect the Urban Mobility and Public Spaces Strategy. By 2032 the City Region should aim to:
- Remove through-traffic from the city centre
- Eliminate non-residential on-street parking
- Reallocate street space to public transport, walking and cycling
- Establish a number of park-and-rides around the City Region
- Include access for those with mobility needs
Without these measures, public realm transformation and air quality improvements will be limited.
9. Secure cycle parking and interchanges
Cycle parking is a significant barrier to everyday cycling. The Delivery Plan should include commitments to:
- Secure, fob-controlled cycle parking at all Merseyrail stations
- Sheffield-stand parking at every station
- Residential cycle hangars in areas of high-density housing and HMOs
- Secure bike parking at key destinations and interchanges
- Include e-bike charging and secure parking hubs
Integration with public transport is essential to building a functional active travel network.
10. Quietways and low-traffic neighbourhoods
The Plan lacks reference to quietways and low-traffic neighbourhoods (LTNs).
These are proven, cost-effective methods of enabling safe cycling and walking without major capital works. They should form a core element of the City Region’s network strategy.
11. Infrastructure must be prioritised over training
While cycle training (e.g. Bikeability) is valuable, the primary barriers to cycling are infrastructure quality, directness and safety.
The Delivery Plan should prioritise high-quality infrastructure delivery over behavioural or promotional interventions.
Any training provided should also extend to professional drivers, including taxi drivers, HGV and bus operators.
12. Air quality and public health must be central
Air quality is a major public health issue across Merseyside. The Delivery Plan should:
- Explicitly recognise the scale of the health impact
- Set measurable air quality improvement targets
- Link decarbonisation and traffic reduction measures directly to health outcomes
- Include education to promote awareness, reduce engine idling, etc.
- Consideration should also be given to mechanisms such as workplace parking levies orclean air approaches to generate funding and reduce car dependence.
13. Engagement must be proportionate and fair
Active travel schemes often face disproportionately high levels of consultation compared with major road schemes.There must be:
- A level playing field in engagement
- Clear governance structures
- Transparent decision-making
A Delivery Plan should define who is responsible for delivery and ensure objectives are SMART, measurable and accountable.
Conclusion
The Local Transport Delivery Plan contains positive ambition. However, to succeed it must:
• Provide transparent funding and phasing
- Embed active travel standards in all schemes
- Prioritise 20mph and safer street design
- Strengthen bus priority
- Align land-use and transport planning
- Commit to secure cycle parking
- Deliver meaningful reductions in car dominance
With clear accountability and high-quality implementation, the Plan has the potential to transform everyday cycling and walking across the Liverpool City Region and deliver on the region’s climate, health and Vision Zero ambitions.