Road Schemes

Information about proposed cycle routes. (Updated 28 March 2025)

LIVERPOOL
Catharine Street, Princes Avenue.
Completed.

Sefton Park Active Travel Corridor
(Princes Avenue Junction Improvements -Croxteth Road Junction Improvements) – consultation closed October.
To be delivered by March 2026

Crown Street
Pop up to permanent – onsite.

Strand Phase 2
AECOM appointed at concept design stage. Preliminary design work ongoing- should be out for consultation early this year. 

Vauxhall Road
Awaiting consultation report. Should be onsite late 2025.
The scheme runs from Hatton Gardens (stopping just short of this) to Sandhills Lane. Uni-directional bike lanes in both directions between those locations – segregated, separated by a kerb buffer island.

West Derby Road
The consultation is now closed. Awaiting updates.

Lark Lane
Work to start March/April 2025. Due to cost restraints the section from Lark Way to Aigburth Road will not now be included in the scheme (this is the bit with Al Dente/Auckland College/School and the GP surgery where they do the farmers market)  

Childwall Route
Preliminary designs being produced now for next round of consultation/engagement.
Consultation May 2025, delivery by March 2026.

Dock Road Cycle Facility/Bath Street – Consultation now closed, should be onsite end of 2025..

City Centre Mobility Strategy – there are several elements to this now. A parking strategy that is city-wide but there is a city centre focused element which will look at how movement is prioritized for walking, wheeling, cycling and public transport.

WIRRAL
Birkenhead to Liscard Active Travel Scheme.
The consultation on this scheme is now closed, but details and a video are still available at:
https://haveyoursay.wirral.gov.uk/lcwip1

Active Travel improvements, Duke Street, Birkenhead
Consultation closed January 2025

KNOWSLEY
Wood Road, Halewood – Active Travel consultation
Consultation closed December 2024